Construction Photos
| 6.5.13 Finished Entry Walk and Foundation Landscaping |
| 6.5.13 Revitalized front yard |
| 6.5.13 New Parking Lot |
![]() |
| 11.15.12 Renovated front yard |
![]() |
| 11.15.12 Renovated back yard with stormwater retention area and new lawn |
![]() |
| 11.15.12 Stormwater retention area |
![]() |
| 11.9.12 Cleaning and preparation of front yard |
![]() |
| 11.9.12 Cleaning and preparation of front yard |
![]() |
| 11.9.12 New ADA accessible route |
![]() |
| 11.9.12 New landscaping - former west walk and ramp area |
![]() |
| 11.9.12 New grading and sodding of back yard |
![]() |
| 10.12.12 New parking lot ready for asphalt |
![]() |
| 10.12.12 Back yard construction access and retention area |
![]() |
| 10.12.12 Forming of new columns at new parking lot entrance |
![]() |
| 10.12.12 New sidewalk as part of ADA accessible route |
![]() |
| 9.18.12 New sidewalk and ramp from new building entrance |
![]() |
| 9.18.12 New sidewalk and ramp |
![]() |
| 9.18.12 Forming of new sidewalk and curb |
![]() |
| 9.5.12 Preparation of new ramp and stairs |
![]() |
| 9.5.12 Excavation and preparation for new access drive and walk |
![]() |
| 9.5.12 New driveway off West Washington Street |
![]() | |||
| 9.5.12 New city sidewalk after installation of new utilities |
![]() |
| 7.30.12 Existing west walk and ramp prior to removal |
![]() |
| 7.30.12 Excavation of front yard for new water and sanitary sewer |
![]() |
| 7.30.12 Excavation of street for new water and sanitary sewer |
![]() |
| 6.6.12 Existing wall cut for new driveway access |
![]() |
| 6.6.12 Salvaged brick from wall demolition to be used for column reconstruction |
![]() |
| 6.6.12 Clearing of site for new parking lot |
![]() |
| 6.6.12 Clearing of site for new parking lot |
![]() |
| 6.6.12 Demolition of existing pavement in area of new building entrance and parking |
![]() |
| 6.6.12 New drywell for stormwater retention |
Before Renovation Photos
![]() |
| 3.19.12 Existing Conditions of Hansel Center prior to renovation activities |
![]() | |||
3.19.12 Existing parking area
|
![]() |
| 3.19.12 Existing perimeter wall to be cut for new driveway |
![]() |
| 3.19.12 Existing lawn area to be transformed into a new parking lot |
![]() |
| 3.19.12 Existing site features; wrought iron fence and brick wall |
![]() |
| 3.19.12 Driveway access off of Washington Street |
![]() |
| 3.19.12 Existing access ramp |