Lehman and Lehman has been commissioned by Kil Architecture Planning to provide Site Survey, Site Design and Construction Document Development for the Project, as well as Construction Administration.
Construction Photos
6.5.13 Finished Entry Walk and Foundation Landscaping |
6.5.13 Revitalized front yard |
6.5.13 New Parking Lot |
11.15.12 Renovated front yard |
11.15.12 Renovated back yard with stormwater retention area and new lawn |
11.15.12 Stormwater retention area |
11.9.12 Cleaning and preparation of front yard |
11.9.12 Cleaning and preparation of front yard |
11.9.12 New ADA accessible route |
11.9.12 New landscaping - former west walk and ramp area |
11.9.12 New grading and sodding of back yard |
10.12.12 New parking lot ready for asphalt |
10.12.12 Back yard construction access and retention area |
10.12.12 Forming of new columns at new parking lot entrance |
10.12.12 New sidewalk as part of ADA accessible route |
9.18.12 New sidewalk and ramp from new building entrance |
9.18.12 New sidewalk and ramp |
9.18.12 Forming of new sidewalk and curb |
9.5.12 Preparation of new ramp and stairs |
9.5.12 Excavation and preparation for new access drive and walk |
9.5.12 New driveway off West Washington Street |
9.5.12 New city sidewalk after installation of new utilities |
7.30.12 Existing west walk and ramp prior to removal |
7.30.12 Excavation of front yard for new water and sanitary sewer |
7.30.12 Excavation of street for new water and sanitary sewer |
6.6.12 Existing wall cut for new driveway access |
6.6.12 Salvaged brick from wall demolition to be used for column reconstruction |
6.6.12 Clearing of site for new parking lot |
6.6.12 Clearing of site for new parking lot |
6.6.12 Demolition of existing pavement in area of new building entrance and parking |
6.6.12 New drywell for stormwater retention |
Before Renovation Photos
3.19.12 Existing Conditions of Hansel Center prior to renovation activities |
3.19.12 Existing parking area
|
3.19.12 Existing perimeter wall to be cut for new driveway |
3.19.12 Existing lawn area to be transformed into a new parking lot |
3.19.12 Existing site features; wrought iron fence and brick wall |
3.19.12 Driveway access off of Washington Street |
3.19.12 Existing access ramp |