The project consists of two trail segments. The first is the Cumberland Crossing Loop that follows Vale Park Road west to Valparaiso Street, north on Valparaiso Street to Bullseye Lake Road, then east on Bullseye Lake Road to the new Cumberland Road extension. This segment is an 8-foot wide asphalt trail in an open right-of-way and is approximately 1 mile in length.
Segment two is a concrete sidewalk that begins at Valparaiso High School and continues south to Ogden Gardens Park. The new 8-foot wide concrete pathway is replacing an old 4-foot wide walk and is approximately 1 mile in length as well. This segment is in a narrow right-of-way and crosses numerous commercial and residential properties. Some right-of-way acquisition was necessary.
Construction began in August 2007, with completion set for May 2008. Below, you will find project photos, with the most recent photos first.
....................................................................................................
....................................................................................................
Campbell Street
3.31.08 Existing open drain prior to reshaping and
bridge construction
3.31.08 Heavy rains leave water at new bridge location
3.31.08 Fresh concrete along the final sections of the pathway
3.31.08 Fresh concrete along the final sections of the pathway
3.31.08 Final base preparation for the remaining
sections of the pathway
....................................................................................................
3.17.08 Excavation and base installation complete –
existing residential retaining wall protected
3.17.08 Construction crews prepare to excavate
for a new concrete retaining wall and stairs
3.17.08 Demolition of existing stairs and
sidewalk along pathway route
....................................................................................................
12.12.07 New concrete apron for property owners
adjacent to trail
12.12.07 New ADA Compliant curb ramps
12.12.07 Accommodation of existing utility infrastructure
12.12.07 New 8’ pathway in front of Valparaiso High School
.....................................................................................................
11.28.07 Demolition complete – pathway route ready
for new curb ramps and sidewalk
11.28.07 Demolition and excavation continues along Campbell St.
.....................................................................................................
Campbell Street

bridge construction




sections of the pathway
....................................................................................................

existing residential retaining wall protected

for a new concrete retaining wall and stairs

sidewalk along pathway route
....................................................................................................

adjacent to trail



.....................................................................................................

for new curb ramps and sidewalk

.....................................................................................................
.....................................................................................................
Cumberland Loop

11.16.07 Final trail paving through existing woods

11.16.07 Final trail paving through existing woods

11.16.07 Constructed trail along Valparaiso Street

11.16.07 Trail terminated at new pedestrian bridge location
......................................................................................................

11.5.07 Trail excavation and aggregate base installation –
Vale Park Road East

11.5.07 Trail excavation and aggregate base installation –
Vale Park Road West

11.5.07 Trail excavation at Vale Park Road and
Valparaiso Street intersection

11.5.07 Trail sub base compaction

11.5.07 Excavated and compacted subgrade
for trail along Valparaiso Street

11.5.07 Site clearing at bridge location
......................................................................................................
Campbell Street Existing Conditions

10.1.07 Proposed concrete pathway/
sidewalk improvements – ADA ramp

10.1.07 Proposed concrete pathway/
sidewalk in front of Valparaiso High School

10.1.07 Proposed commercial drive concrete apron improvement

10.1.07 Proposed pathway improvements and landscape renovation

10.1.07 Proposed pathway and private residential stair improvement

10.1.07 Proposed pathway improvement – utility accommodation

10.1.07 Proposed residential drive concrete apron improvements
......................................................................................................
Cumberland Loop Existing Conditions

8.28.07 Proposed asphalt trail path location
along Vale Park Road (view to east)

8.28.07 Proposed asphalt trail path location
along Vale Park Road (view to west)

8.28.07 Proposed pedestrian bridge location

8.28.07 Proposed asphalt trail path
location along Valparaiso Street