Purdue University (West Lafayette, Indiana) commissioned Lehman & Lehman this past spring to assist in the design and development of their new Recreational Sports Outdoor Courts due to their displacement by campus expansion.
Professional assistance included coordination with the Recreational Sports Division, the Purdue Construction Department, as well as the preparation of necessary construction drawings based on the Feasibility Study previously prepared by Lehman & Lehman, Inc.
The project was completed in May of 2007. The photos below show the completed site, with photos before and during construction following the finished product.
Professional assistance included coordination with the Recreational Sports Division, the Purdue Construction Department, as well as the preparation of necessary construction drawings based on the Feasibility Study previously prepared by Lehman & Lehman, Inc.
The project was completed in May of 2007. The photos below show the completed site, with photos before and during construction following the finished product.
6.20.07 New sand volleyball courts west of Aquatic Center
6.20.07 New sand volleyball courts
6.20.07 New basketball courts with final court surfacing
6.20.07 New basketball court with final court surfacing
....................................................................................................
2.5.06 Location of new outdoor basketball courts
2.5.06 Rear entry to the Recreational Sports Center (pre-construction)
2.5.06 Location of new Sand Volleyball Courts
directly west of Aquatic Center (pre-construction)
12.5.06 Location of North Basketball Court
(to be completed in the spring of 2007)
12.5.06 Asphalt base for the South Basketball Court
12.5.06 Excavation for new Sand Volleyball Court
12.5.06 Final subgrade for Sand Volleyball Court
12.5.06 New concrete court edge; subsurface drain tile
12.5.06 New Pedestrian walkway west of the Aquatic Center